Asia

India | Tender Health Check: Status Of Ess Tenders As Of December 2023

50 Tenders | 46 GWh ESS Capacity (31 GWh PSP, 3 GWh BESS, 12 GWh tech. agnostic) with 23.4 GW of associated RE Capacity (9 under execution (2 GWh) | 19 open tenders (29 GWh) | 3 Operational) ESS capacity not including the ESS capacity to be included in FDRE tenders, additional 16.4 GW PSP tender in MP

Innovation: A shift from initial small EPC tenders to peak power tenders, to Renewable Round the Clock (RTC), to standalone BESS and PSP tenders and now Firm & Dispatchable RE (FDRE) tenders Variety: 31 Build Own Operate (BOO), 14 Engineering Procurement and Construction (EPC), 3 Build Own Operate Transfer (BOOT) Tenders | 45% tenders awarded | 13 Standalone ESS tenders (4 PSP & 7 BESS specific) Focus 2023: 25 Tenders issued (40 GWh) | 10 Firm and Dispatchable RE (FDRE) tenders with 11.5 GW RE capacity | Largest PSP tender tendered during the year – 16.4 GW (MP) 16.4GW capacity distributed across 14 sites selected by the state

720 MWh 170 MWh 18 MWh

60 MWh

Total ESS capacity tendered in the year

Source: Analyzed and Compiled from public announcements by SECI, MNRE, MoP and Organization Announcements; Tender Results

6 GWh

40 GWh

Extracted from the PDF; charts and images may read imperfectly.

Page 293 · 11/11