Cell & Pack Manufacturing
Pages 40–68 (29 pages)
Text on page 44
Gigafactory Tracker - 1,897 GWh of Capacity France 1 ACC, 40 GWh* 2 Envision AESC/Renault, 30 GWh* 3 Verkor/Renault, 50 GWh* 4 Prologium, 48 GWh* Germany 5 ACC, 40 GWh* 6 CATL, 14 GWh* 7 Leclanche, 2.5 GWh 8 Northvolt, 60 GWh* 9 SVOLT, 24 GWh 10 SVOLT, 16 GWh* 11 Tesla, 100 GWh* 12 PowerCo, 40 GWh* Italy 13 ACC, 40 GWh* 14 ITALVOLT, 70 GWh* Portugal 15 CALB, 45 GWh* Netherlands 16 Eurocell, 1 GWh
Sweden 17 Northvolt, 60 GWh* 18 Volvo* 19 NOVO, 50 GWh*
Spain 29 Envision AESC, 50 GWh* 30 PowerCo, 60 GWh* 31 Basquevolt, 10 GWh*
U.K. 32 Envision AESC, 35 GWh* 33 Tata, 40 GWh* 34 AMTE Power, 10 GWh
Source: Felt: Global Battery Factory Database, Benchmark Minerals, Battery-News.de
Czech Republic 37 MES, 15 GWh*
Norway 25 Elinor* 26 FREYR, 29 GWh* 27 Morrow, 43 GWh* 28 Beyonder, 10 GWh*
Poland 36 LGES, 115 GWh*
Hungary 20 CATL, 100 GWh* 21 Cellforce Group, 10 GWh* 22 EVE Energy, 28 GWh* 23 Samsung SDI, 40 GWh* 24 SK, 47.3 GWh*
*Non-operational, slated for future date
Slovakia 35 Inobat, 10 GWh
Extracted from the PDF; charts and images may read imperfectly.
Page 44 · 5/29