Cell & Pack Manufacturing
Pages 40–68 (29 pages)
Text on page 61
Cell & Pack Manufacturing Challenges
slow throughput due to long time required; fire (most factory fires occur here)
Manufacturing Process Map | 3. Formation
Manufacturing Process Map | 3. Formation Charging & Discharging Electrochemical activation. SEI is formed on the anode
Aging Battery is stored at a certain temperature and humidity for an even electrolyte dispersion and SEI stabilization
5-25 days
of total manufacturing cost
time
scrap rate
Charging, Discharging, & Aging The previous processes are repeated
Challenges
throughput; factory footprint
Challenges throughput
Degassing
Challenges
residual gas inside the cell; seal quality; throughput (a lot of additional CAPEX)
Pouch only. Air pocket with gas (sacrificial gas bag) formed during aging is cut off inside of vacuum chamber.
Quality Control End of line check capacity, resistance, voltage, and cosmetic
Challenges
cosmetic & variation in capacity; yield
*Graphics courtesy of LG Energy Solution. Reproduced with permission.
Source: LG Energy; BCG; RWTH PEM