Applications: Stationary Energy Storage
Pages 182–232 (51 pages)
Text on page 209
Committed Projects Anticipate LDES Growth to 3% of BESS by 2029 from 0.1% in 2025 LDES PROJECT PIPELINE BY OPERATIONAL DATE Operational Capacity GW
0.5GW/4.4GWh of LDES projects are operational outside of China 0.1% by power). Only 91MW/563MWh of that capacity has been installed since 1991, of which 35MW/300MWh came online in 2025 14 2024 additions). 8-hour lithium-ion projects comprise 78% of the project pipeline projections for 2030. However, most LDES policies are technology agnostic and heavily weight bid price and deliverability.
Policies in California and Ontario, Canada, exclude lithium-ion and could enable early deployments of emerging technologies that reduce tech risk and bring down cost
Source: Content provided courtesy of Sightline Climate. Developer-provided COD estimate. Data excludes pumped hydro.