Applications: Data Centers
Pages 233–242 (10 pages)
p.236Page 236 · 4 of 10 in section
Companies on this page · in the Battery Business Directory
Text on page 236
The Energy Ecosystem Underpinning Data Center Development, with Batteries at the Core
Major BESS Deals of 202425 Aligned Data Centers announced a landmark 31 MW / 62 MWh BESS deal in October 2025 with Calibrant Energy for a Pacific Northwest campus PJM awarded interconnection to 23 BESS projects totaling 2.2 GW in December 2025, many co-located or hybrid with data center hotspots in the mid-Atlantic to ease grid strain from AI loads
Source: AI Hit a Wall in 2025. That Wall Is Power, Substack
Extracted from the PDF; charts and images may read imperfectly.
Page 236 · 4/10
More in Industry
Overviewp.5Notable Eventsp.7Industry Value Chainp.21Financep.50Costsp.68Cell & Pack Manufacturingp.83Applicationsp.127Applications: EVp.130Applications: Stationary Energy Storagep.182Applications: Aviation, Drones, Spacep.243Applications: Roboticsp.256Applications: Otherp.264Safetyp.266Cell Design and Materialsp.282Cell Design and Materials: Li-Ionp.297Cell Design and Materials: Lithium Sulfurp.360Cell Design and Materials: Solid-Statep.367Cell Design and Materials: Sodium-Ionp.387Cell Design and Materials: Alternative Chemistriesp.397Supply Chain: Upstream and Midstreamp.419Supply Chain: Recycling & Secondary Marketsp.439Software / AIp.455