VFBATTERY REPORT

Applications: Aviation, Drones, Space

Pages 243–255 (13 pages)

Battery Report 2025, page 254: Applications: Aviation, Drones, Space
Text on page 254

eVTOL/Electric Aircraft Charging Requirements Highlight High-Power Infrastructure Necessity

High-power demand and grid impact: eVTOL vertiports will require megawatt-scale charging capacity 1 MW or more per site), far beyond typical loads, meaning significant local grid upgrades and utility planning are needed for reliable operations.

On-site energy solutions needed: To mitigate grid stress and support frequent high-power charges, integrating on-site energy generation and storage (e.g., microgrids) with renewables is a key strategy highlighted by NREL and industry analysis.

Infrastructure planning advancing: FAA and industry stakeholders recognize the need to incorporate eVTOL charging nodes into vertiport/airport planning now, with siting, operations, and standards discussion ongoing across credible aviation infrastructures.

Commercial rollouts drive charging network build-out: Global partnerships and pilot projects (e.g., Abu Dhabiʼs vertiport charging rollout) reflect real-world deployment of dedicated eVTOL electric charging infrastructure to support advanced air mobility services.

Source: National Laboratory of the Rockies (formerly NREL, BETA Technologies

Extracted from the PDF; charts and images may read imperfectly.

Page 254 · 12/13