Cell & Pack Manufacturing
Pages 83–126 (44 pages)
Text on page 93
European Gigafactory - 1,141* GWh of Capacity FRANCE 1 ACC, 13 GWh, 27 GWh) 2 AESC, 10 GWh, 20 GWh) 3 Verkor/Renault, 16 GWh, 34 GWh)
4 Prologium, 48 GWh) 5 Tiamat, 5 GWh GERMANY 6 ACC, 40 GWh)** 7 CATL, 14 GWh, (10 GWh) 8 Leclanche, 2 GWh 9 Lyten Northvolt Drei, 15 GWh) 10 SVOLT, 24 GWh)** 11 SVOLT, 16 GWh)** 12 Tesla, 8 GWh 13 PowerCo, 20 GWh, 20 GWh) 14 Customcells, (+unknown GWh)** 15 EAS, 0.5 GWh ITALY 16 FAAM, 0.35 GWh, 8 GWh
SWEDEN 18 NOVO Volvo, 50 GWh)** 19 Lyten Northvolt Ett, 16 GWh HUNGARY 20 CATL, 40 GWh 60GWh 21 EVE Energy, 28 GWh) 22 Samsung SDI, 40 GWh, 10GWh
U.K. 31 AESC, 17.6 GWh, 17.4 GWh) 32 Agratas/Tata, 40 GWh) 33 Nanotech Energy, (+unknown GWh) 34 EVE Energy, 60 GWh)
SERBIA 36 ElevenEs, 48 GWh)
NORWAY 25 FREYR, 29 GWh)** 26 Morrow, 1 GWh 42 GWh)
POLAND 37 LGES, 90 GWh, 25 GWh)
10 GWh)
30 CATL/Stellantis, 50 GWh)
Several gigafactories have been halted due to weakened market demand, energy costs, or organizational issues.
SLOVAKIA 35 Gotion Inobat, (40 GWh)
23 SK On, 47.5 GWh 24 Sunwoda, (+unknown GWh)
SPAIN 27AESC, 50 GWh) 28 PowerCo, 60 GWh) 29 Basquevolt, unknown GWh
Total capacity shrunk by 363 GWh from previous year.
CZECH REPUBLIC 38 MES, 1.2 GWh)
33 TURKEY 34 32 39 Siro, 50 GWh) 40 Maxxen, 1.5 GWh 3.5 GWh) 4 41 Pomega, 2 GWh 3 GWh 3 2 42 Aspilsan, 0.2 GWh 0.8 GWh) 5
PORTUGAL 17 CALB, 15 GWh)
BASIC FORMAT = Current Capacity GWh, (+Additional Future Capacity GWh) CONSTRUCTION AT RISK = (+Additional Future Capacity GWh)* CONSTRUCTION HALTED/BANKRUPTCY = (+Additional Future Capacity GWh)**
Source: All uncited factories are from Batteriezellproduktion: Europa gerät ins Hintertreffen
*total includes future & current capacities; excludes plants with halted construction; takes the highest of future capacity ranges (if range exists) note: sodium-ion excluded
Extracted from the PDF; charts and images may read imperfectly.
Page 93 · 11/44