VFBATTERY REPORT

Cell & Pack Manufacturing

Pages 83–126 (44 pages)

Battery Report 2025, page 96: Cell & Pack Manufacturing
Text on page 96

EVE ENERGY, 73 Jingmen, 146 GWh, 43 GWh) 74 Chengdu, 20 GWh, 50 GWh) 75 Shenyang, 10GWh, 30 GWh) 76 Huizhou, 24 GWh 77 Qujing, 11.5 GWh, 14.5 GWh) 78 Nantong, 10 GWh 79 Yuxi, 10 GWh) SK ON 80 Yancheng, 57 GWh 81 Changzhou, 7.5 GWh REPT 82 Jiaxing, 32 GWh, 45 GWh) 83 Wenzhou, 26 GWh, 24 GWh) 84 Foshan, 15 GWh, 17 GWh) 85 Chongqing, 30 GWh) 86 Liuzhou, 10 GWh, 10 GWh) HITHIUM 87 Chongqing, 28 GWh, 33 GWh) 88 Xiamen, 45 GWh 89 Heze, 30 GWh) AESC 90 Shiyan, 20 GWh, 20 GWh) 91 Ordos, 10.5 GWh, 20 GWh) 92 Cangzhou, 10 GWh, 20 GWh) 93 Wuxi, 20 GWh

CORNEX 94 Xiaogan, 35 GWh, 115 GWh) 95 Yichang, 65 GWh, 80 GWh) 96 Xiangyang, 70 GWh) 97 Wuhan, 10 GWh, 40 GWh) GREAT POWER 98 Quzhou, 11 GWh, 36 GWh) 99 Qingdao, 12 GWh, 24 GWh) 100 Ulanqab, 11 GWh) 101 Liuzhou, 10.5 GWh 102 Xuancheng, 10 GWh) 103 Changzhou, 3 GWh, 4 GWh 104 Zhuhai, unknown GWh 105 Zhumadian, unknown GWh GANFENG 106 Chongqing, 10 GWh, 34 GWh) 107 Hohhot, 20 GWh) 108 Xiangyang, 20 GWh) 109 Xinyu, 13 GWh, 6 GWh 110 Dongguan, 10 GWh) 111 Nanchang, 10 GWh) FARASIS 112 Ganzhou, 37 GWh, 12 GWh) 113 Guangzhou, 15 GWh, 15 GWh) 114 Zhenjiang, 24 GWh 115 Kunming, 24 GWh)

PYLON 116 Hefei, 5 GWh, 5 GWh 117 Yangzhou, 8 GWh AMPACE 118 Xiamen, 12 GWh, 18 GWh)

SAMSUNG SDI 119 Xiʼan, unknown GWh

PANASONIC / PPES 120 Dalian, 15 GWh

BASIC FORMAT = Current Capacity GWh, (+Additional Future Capacity GWh)

*total includes future & current capacities; excludes plants with halted construction **note: sodium-ion excluded Source: New Energy Terminal

EVE Energy and SK On restructured their joint-ventures, swapping shares so SK On took full control of its Yancheng plant, while EVE gained full ownership of the Huizhou plant.

Extracted from the PDF; charts and images may read imperfectly.

Page 96 · 14/44